We have undertaken contracts in excess of £1m and would be glad to discuss your requirements. We can give you a competitive price backed by a very experienced team of trades people.
Some of our Completed Projects
Alteration and refurbishment of existing offices into 21nr 1 bed apartments and 2nr 1 bed accessible flats plus laundry included stripping out existing office areas and constructing new lift shaft and lift car, replacing main felt, flat roof with insulated GRP, replacement of existing steel windows with uPVC and feature panelling system, new heating, plumbing and electrical works throughout, new walls, internal finishes and decoration.
Alteration of 10nr existing units with shared living space for 3 people into 22nr one bed flats, 1nr mother and child unit. Alteration and conversion of the offices, laundry and storage space into new offices, training space and workshop including the installation of a district heating system with air source heat pump.
The works were phased with existing offices and accommodation being maintained for residents while new flats being constructed.
Extension and refurbishment of doctors’ surgery to build offices into a new 1st floor with additional ground floor area for consulting and waiting rooms.
The works were phased with temporary waiting and consulting rooms being provided to increase existing surgery and offices so that doctors and patients continued to be accommodated while new surgery was being constructed.
The refurbishment and alteration of the ground floor of Hestia House to form new offices including installation of heating and electrical services.
Following a previous successful contract for the office to residential conversion of the upper floors, the incoming owner received more investment and appointed Jericho Construction to complete the works in the building.
The works were phased to enable residents to continue occupying the upper floors and office staff to continue to occupy the ground floor areas to be refurbished.
Alteration of community hall only used for storage into Balsall Heath Academy for Social Enterprise.
Works included repairing pitched tiled and flat felt roofs, replacement of existing steel windows with uPVC, new heating, plumbing and electrical works throughout, new walls, internal finishes and decoration.
Alteration and refurbishment of existing warehouse and mezzanine areas. Transfer Café from 1st floor to Ground including upgrade commercial kitchen and maintain services and accommodation for Friends of the Earth Staff.
Works included stripping out existing office areas and constructing new lift shaft and lift car, replacing felt flat roof, replacement of existing steel doors and windows with timber, new heating, plumbing and electrical works throughout, new walls, internal finishes and decoration.